Data Center - Construction Project Manager Job at Vitality Group, Houston, TX

L2ZvTGNWZ29leXEzL2Z4ci9WSzJ3dWczQ1E9PQ==
  • Vitality Group
  • Houston, TX

Job Description

If you’ve built your experience on technically demanding projects whether in commercial, healthcare, life sciences, or anything MEP-heavy - this is a chance to apply that background in one of the fastest-growing sectors in construction today.

We’re a well-established General Contractor in the Houston area, delivering complex data center and mission-critical projects, and we’re looking to bring on a Project Manager who can step into that environment. Data center work continues to expand, and this role puts you right in the middle of it, building on what you already know while pushing your experience further.

Qualifications

• Experience managing data center, mission-critical, or technically complex construction projects

• Strong work history with reputable General Contractors

• Strong understanding of MEP coordination and building systems

• Ability to manage schedules, budgets, and subcontractor coordination

• Clear communication and steady leadership within project teams

You’ll see most of the work happening around Houston, but it regularly touches nearby areas like Katy, Sugar Land, The Woodlands, Pearland, and Cypress as projects progress. Travel varies depending on location.

If interested- please apply here. You are also welcome to connect with one of our associates if you do not have an updated resume, or visit our website and complete the short form so we can schedule a time to discuss further. All inquiries are confidential.

Job Tags

For contractors, For subcontractor

Similar Jobs

Hawthorne Lane

Administrative Assistant/Receptionist Job at Hawthorne Lane

Be the first face and voice of a highly regarded Washington, DC association. As the Administrative Assistant/Receptionist, youll play a pivotal role in creating a welcoming experience for clients, visitors, and staff while ensuring smooth daily operations behind the scenes... 

BBC

Social Media Producer Job at BBC

JOB DETAILS JOB BAND: C CONTRACT TYPE: Permanent, Full-time DEPARTMENT: BBC Studios StoryWorks LOCATION: New York Hybrid WE ARE BBC STUDIOS A globally renowned media company borne of the BBC, BBC Studios funds, creates, distributes, and commercializes...

Cavco Industries, Inc.

3D Artist Job at Cavco Industries, Inc.

 ...ABOUT THE ROLE The artist is responsible for modeling, shading, lighting, and 3D visuals in digital renderings. The artist creates renderings to be photo-realistic images and virtual walk throughs of our product. Modeling from architectural, shop and production drawings... 

Critical Systems, Inc.

TIG Welder Job at Critical Systems, Inc.

 ...The welder performs high-quality welds and assembles custom stainless-steel weldments using GTAW/TIG processes in a clean, indoor, and airconditioned manufacturing facility. This role requires careful attention to detail, the ability to interpret technical drawings, and... 

Ameron Pole Products

Production Associate Job at Ameron Pole Products

 ...Operate and monitor plant equipment and machinery such as forklifts, loaders, overhead cranes, powered tools, stress jacks, and production...  ...and pulling of materials Physically active role requiring standing, walking, and working in a production setting for extended...